Description

We were hired by Top Golf who was installing their Toptracer technology at Bing Maloney Golf Complex. We had to do pull testing to 1400 pounds on the 5/8” wedge bolts in accordance with the California building code regarding structural seismic applications.

Location
Bing Maloney Golf Course, Freeport Boulevard, Sacramento, CA, USA
Concrete footing with a steel pole base at a golf driving range