Description

The NYC School Construction Authority SCA was renovating the exterior of The Ella Baker School in the Upper East Side.  The SCA required the general contractor to pull test the scaffold system anchors to ensure that they could support the demands of the scaffold system.  We tested the Dewalt Power Stud + SD1 Wedge Anchors to 2500 lbs each.  They passed and they were able to proceed with the project.

Location
M225 The Ella Baker School, East 67th Street, New York, NY, USA